News

Correct Use Posture Of Glue



1, the construction site requirements: The site should be smooth, no sand, no shell, no bump phenomenon, otherwise, need to smooth wipe;

2, need to be in the flat Dry foundation construction, the artificial lawn and the connection belt's contact surface all must daub the glue evenly, thus can use the time longer.

3, the artificial lawn and the connection belt must be dry, no dust oil, etc., when sufficient time is necessary to dry after rinsing in use.

4, in the artificial lawn and the connection tape after finishing, natural drying for 10-20 minutes and then the lawn to fit, the lawn evenly pressed downwards to close the pressure, so that the turf materials coated with contact in place.